NARANI

Windows desktop software

Sync video across multiple screens.

NARANI is a Windows multi-screen video player. Build video groups — up to four windows each — schedule which group plays when, and keep those screens in sync. Built for exhibit walls, lobby displays, and kiosk PCs — not a remote watch-together app.

  • What it is A desktop player, not a website. Download Setup, install, run.
  • What it does Video groups, weekday schedules, and synced multi-monitor playback.
  • Who it is for Exhibit walls, lobby video, and unattended kiosk PCs.

Official Windows installer from otacosystem · Full trial · Same build you can unlock later

NARANI Status tab showing the active video group and per-window playback

Need a multi-screen video sync player?

If you searched for how to play video on multiple monitors at the same time — and keep the screens in sync — that is what NARANI does. One Windows PC. Several displays. Playback locked together.

  • Multi-monitor video playback Drive up to four screens from one PC. Assign a video and a monitor to each window inside a video group.
  • Groups & schedules Switch layouts through the day. Sync mode keeps every window on the same beat; shorter clips wait, then the whole wall restarts together.
  • Video walls, lobbies, kiosks Built for venues that leave a PC running — not for watching a movie with friends over the internet.

Layouts you can switch.

A group is a full wall layout — window count, files, monitors, sync. Build a few, then play or schedule them.

  • Up to 4 windows per group Multi-wall exhibits without juggling separate players.
  • True sync playback Screens stay on beat. Shorter clips wait, then everything restarts together.
  • Fit any install Pick the monitor, size, and angle — including upside-down mounts.
  • Named & color-coded Spot Lobby Wall vs Night Loop on the schedule timeline at a glance.
NARANI Video groups tab with Lobby Wall selected and two window slots

Different show, different hour.

Drag group chips onto a weekday timeline. NARANI switches layouts for each time range — mornings, evenings, weekends.

  • Weekday timeline Place colored blocks for each group. Resize the edges to set start and end.
  • Automatic switch When a block starts, NARANI loads that group. If something is already playing, the switch waits until the current loop finishes. Empty ranges stay dark.
  • Status at a glance See which group is playing and why — schedule or default.
NARANI Video schedule with Lobby Wall and Night Loop blocks on weekdays

Close the venue. Leave the PC.

Set shutdown times once. NARANI handles the rest — nights and weekends included.

  • Your hours, not overtime Arm weekdays, skip closed days. No late walk-throughs to power down.
  • Drag the pin Place a shutdown time on each day bar. Toggle days on or off.
NARANI Shutdown schedule with Mon–Fri pins at 22:00

Built to run without you.

Kiosk settings keep the wall looking like a show — not a Windows desktop.

  • Starts with the app Auto-play begins when NARANI launches — no click needed.
  • Clean visitor view Hide the cursor, taskbar, notifications, and edge swipe while video plays.
  • Stays on the wall Auto-restart brings NARANI back if someone closes it (installed Setup build only).
  • Sound under control Audio from window 1 only — no multi-speaker chaos.
  • Your look, your language Dark or light UI — plus the language your operators already use.
NARANI Settings tab with playback, sound, kiosk, theme, and language

Activate once. Stay current.

License this PC, pull updates when you are ready, and send logs if something needs a look.

  • Bound to this machine One key. One PC. Straightforward activation when the trial ends.
  • Updates without a site visit Check the cloud build and update when a new version is ready.
  • Support from the venue Send recent logs without packing a laptop for a site visit.
NARANI More tab with license, app update, and support

Try the wall. Pay for the PC.

Full features in trial. When the room is right, unlock a license bound to this machine.

Trial

Free to prove it

72 hours

of accumulated playback — not calendar days.

  • Full NARANI feature set
  • Test on your real displays
  • No credit card to start
Download trial

License

One PC. Unlocked.

See checkout

Hardware-bound key for this machine.

  • Activate online once
  • Play offline after that
  • Cloud updates when you need them
  • 14-day refund before activation
Buy license

Test on trial first. Refund within 14 days if the key is not activated, or after that only for activation failure or a confirmed defect. New PC means a new license. Board swaps and support exceptions are handled manually after purchase. Terms · Privacy

Built for Windows installs.

Know what the PC needs before you roll it into the venue.

Official installer. Clear steps.

NARANI is a real Windows app. Microsoft may warn on first install when a publisher certificate is not yet widely known — that can happen with new software. For the download step, we recommend Google Chrome — Microsoft Edge often blocks NARANI_Setup.exe before it finishes saving.

Official source Download only from this site or the NARANI download link.
Publisher otacosystem · support: syncpleadmin@gmail.com
What you get Latest Setup.exe · full trial · same app you activate later
File name NARANI_Setup.exe
Version Loading…
Size —
SHA256
Loading…

After download, you can verify the file hash matches this value.

  1. Prefer Chrome for download Open this page in Google Chrome, then use Download trial. Edge frequently blocks the .exe download; Chrome usually saves it.
  2. Download the trial Save NARANI_Setup.exe from this site only — do not use random mirrors.
  3. If Edge blocked the file Switch to Chrome and download again. Or in Edge Downloads, look for a Keep / More actions option if one appears. Then run the file from Downloads.
  4. If Windows SmartScreen appears Click More info, then Run anyway (wording can vary by Windows version). You are installing the NARANI build we publish for venues.
    1 · First screen
    2 · After More info
  5. Finish setup and try the wall Install, launch NARANI, create a video group, assign videos to monitors, and run your trial — 72 hours of accumulated playback, full features.
  6. Stuck? Write us Email syncpleadmin@gmail.com with a screenshot. We will help you through the install.

Recommended browser for download: Google Chrome

Short how-tos for the wall.

Step-by-step pages for search and setup — sync, weekday schedules, and kiosk mode. English and Korean.

Answers before you buy.

The questions venues ask before a license leaves the cart.

How do I play videos in sync on multiple monitors?

Install NARANI on the Windows PC that drives the displays. Create a video group, set the window count, pick a video and a monitor for each window, choose Sync, then press Play on the Status tab. Full walkthrough: How to sync video on 2–4 monitors.

Can I schedule different video layouts through the day?

Yes. Build multiple video groups, then drag them onto the weekday timeline in Video schedule. NARANI switches groups for each time range. If something is already playing, the switch waits until the current loop finishes. Empty ranges do not play. See Video wall schedule by weekday.

Can each screen play a different video?

Yes. Inside a group, each window can use its own file. Sync mode still starts and restarts them together. Async lets every screen loop on its own.

Is NARANI the same as Syncplay?

No. Syncplay is for watching the same file with remote friends. NARANI is a local multi-screen video player: several monitors on one PC, in an exhibit, lobby, or kiosk.

What is the refund policy?

Use the full 72-hour playback trial on your displays before you buy. After purchase, you can request a refund within 14 days if the license key has not been activated on any PC. After activation, or after 14 days, refunds are only for activation failure or a confirmed defect we cannot fix after support. Email syncpleadmin@gmail.com with your order details; Lemon Squeezy processes the payment refund. See Terms for the full policy.

How does the trial work?

You get full features for 72 hours of accumulated playback time while video is playing — not 72 days from install. When time runs out, playback locks until you activate.

Is the license tied to one PC?

Yes. One key binds to one machine. Moving to a new PC requires a new purchase. Hardware failures can be handled as a support exception.

Do I need the internet every day?

Activation needs internet once. After that, day-to-day playback can run offline. Use Check status in the app when you want to refresh license state online.

What does Sync mode actually do?

All windows follow the longest video. Shorter clips freeze on the last frame, then everything restarts together. Async lets each window loop alone.

Can it run unattended in a lobby?

Yes. Auto-play, hide cursor, block taskbar and edge swipe, scheduled shutdown, and auto-restart (installed Setup build only) are built for kiosk installs. Step-by-step: Kiosk player: hide taskbar & auto-restart.

Windows says the app is unrecognized. Is it safe?

The installer from this site is the official NARANI build from otacosystem. New Windows apps without a long SmartScreen history often show a warning. Choose More info → Run anyway, or see the Install section. If anything looks wrong, email syncpleadmin@gmail.com before you continue.

Where should I download NARANI?

Only from narani.pages.dev (this site) or the Download trial button, which serves the latest official Setup. Avoid third-party mirrors. For the download itself, use Google Chrome — Microsoft Edge often blocks the installer file.

Edge blocks the download. What should I do?

That is a browser protection quirk with new .exe files, not a broken link. Open this site in Chrome and download again. Then follow the Install steps if Windows SmartScreen appears when you run Setup.

Talk before you commit.

Questions about NARANI — features, trial, license, hardware, or setup — send a message and we will reply to your email.

Or write us at syncpleadmin@gmail.com

NARANI

Ready when the room is.

Run 72 hours of full playback on your displays. Unlock this PC when you are sure. Need the Windows warning steps? See install guide.

Windows 10 (1709+) / 11 · Hardware-bound license · WebView2 required · Download with Chrome recommended